CDCP, CDCS, DCCA & Cisco CCT Data Center: practice drill
10 realistic exam questions, graded as you go, with the exact rule or statute citation for every answer. Start free, no sign-up.
Timed mock exam
30 questions in 36 minutes, drawn from every topic. No answers shown until the end, then a full score breakdown, your weakest topics and a review of what you missed.
Prices are in US dollars, plus tax where it applies. Stripe, our payment processor, calculates tax at checkout.
All sales are final. If something is really wrong, such as a duplicate charge or a purchase that does not unlock what you bought, write to support@careerexampro.com and we will put it right.
One-time payment. Nothing renews.
You have an exam ticket for this practice test. Start the timed mock exam to use it.
Exam Snapshot & Official Blueprint
Official Exam Fee
Employer technical screen (AWS / Meta / Google / Colocation)
LOTO (OSHA 29 CFR 1910.147): Notify -> Shut down -> Isolate energy -> Apply personal lock & tag -> Release stored energy -> Verify zero energy (Try-Test-Try) before touching conductors.
RAID Failure Triage: RAID 1 mirrors (1 drive fault tolerance); RAID 5 stripes + single parity (1 drive); RAID 6 stripes + dual parity (2 drives); RAID 10 stripes across mirrors (survives 1 drive per mirror pair, never both in the same mirror).
Optical Hygiene: Inspect and dry-clean every LC/MPO ferrule before mating—microscopic dust causes high insertion loss, CRC errors, and link flapping on 100G/400G/800G links.
Frequently Asked Questions
What do hyperscale data center technician interviews test most heavily?
Hyperscale screens focus on practical triage: RAID recovery, BIOS/POST/BMC (IPMI/iDRAC/iLO) diagnostics, single-mode vs. multi-mode fiber optics, A/B PDU power balancing, airflow containment, and strict LOTO safety.
Exact question counts, passing scores, and allowed reference materials vary by testing window and state/agency. Always confirm current rules with the official testing provider.
Sample questions
Under EIA-310-D / IEC 60297 rack standards, what is the vertical height of one rack unit (1U), and where should the heaviest storage JBODs or rack-mount UPS units be installed inside a 42U cabinet?
1.75 in (44.45 mm); mount heaviest chassis at the bottom for stability.
2.00 inches (50.80 mm); mount the heaviest chassis at the top to aid natural convection cooling.
1.50 inches (38.10 mm); mount the heaviest chassis in the middle at 20U–24U for ergonomic access.
1.75 inches (44.45 mm); mount the heaviest chassis at the top so overhead cable trays support them.
Show the answer
A. 1.75 in (44.45 mm); mount heaviest chassis at the bottom for stability.
One standard rack unit (1U) equals 1.75 inches (44.45 mm), containing three mounting holes spaced across the rail. Heavy equipment (UPS modules, battery packs, dense storage enclosures) must always be mounted at the bottom of the rack to lower the center of gravity and prevent tip-over hazards when sliding rails out.
A critical power subsystem has a documented Mean Time Between Failures (MTBF) of 9,995 hours and a Mean Time To Repair (MTTR) of 5 hours. What is the steady-state availability of this subsystem?
99.999%, which meets the five-nines benchmark of roughly 5.26 minutes of downtime per year.
99.50%, because 5 hours of repair time represents half a percent of each thousand hours.
99.90%, because availability is calculated by subtracting MTTR from MTBF and dividing by 10,000.
99.95%, calculated as MTBF divided by the sum of MTBF plus MTTR (9,995 / 10,000).
Show the answer
D. 99.95%, calculated as MTBF divided by the sum of MTBF plus MTTR (9,995 / 10,000).
Steady-state availability is defined as A = MTBF / (MTBF + MTTR). Here, 9,995 / (9,995 + 5) = 9,995 / 10,000 = 0.9995, or 99.95%. Five-nines (99.999%) would require an MTBF-to-MTTR ratio of roughly 99,999 to 1.
A technician decommissions four 2U compute nodes from the middle of a 42U cabinet in a cold-aisle-contained row, leaving an 8U open gap. Why must snap-in blanking panels be installed immediately?
To provide structural shear bracing required to hold the remaining servers on their slide rails.
To block hot rear exhaust from recirculating into cold server intakes.
To increase static air pressure inside the hot aisle so CRAC return fans draw less electrical current.
To satisfy NFPA 70E arc-flash containment rules for low-voltage Ethernet patch cables.
Show the answer
B. To block hot rear exhaust from recirculating into cold server intakes.
Open U-spaces create a low-resistance short circuit allowing hot exhaust air from the rear of the rack to pull straight back into the cold aisle and enter adjacent server intakes, causing localized thermal hotspots and higher server fan power draw. Installing blanking panels seals the front plane.