CDCP, CDCS, DCCA & Cisco CCT Data Center: practice drill
10 realistic exam questions, graded as you go, with the exact rule or statute citation for every answer. Start free, no sign-up.
Timed mock exam
21 questions in 25 minutes, drawn from every topic. No answers shown until the end, then a full score breakdown, your weakest topics and a review of what you missed.
Prices are in US dollars, plus tax where it applies. Stripe, our payment processor, calculates tax at checkout.
All sales are final. If something is really wrong, such as a duplicate charge or a purchase that does not unlock what you bought, write to support@careerexampro.com and we will put it right.
One-time payment. Nothing renews.
You have an exam ticket for this practice test. Start the timed mock exam to use it.
Exam Snapshot & Official Blueprint
Official Exam Fee
$600–$750 (EXIN / EPI — requires active CDCP)
Format & Time Limit
60 MCQs · 90 minutes (closed-book)
Passing Standard
65% (39 of 60 correct)
Typical Prep Incumbents
$2,400–$3,400 (EPI accredited 3-day course)
Official Domain Breakdown
Exam Domain
Weight
Availability, MTBF/MTTR, Tier III/IV Design & Single Points of Failure
Commissioning (IST), Fire Engineering, Cabling & Lifecycle Operations
20%
High-Yield Formulas, Statutes & Rules Cheat Sheet
Availability Math: Availability = MTBF / (MTBF + MTTR). Five-nines (99.999%) permits only ~5.26 minutes of unplanned downtime per year; four-nines (99.99%) permits ~52.6 minutes/year.
Sensible Cooling & Airflow: kW = (CFM × ΔT_°F) / 3160 (approx. at sea level). Higher rack ΔT reduces required airflow for the same heat load.
Direct-to-Chip Liquid Cooling (ASHRAE W-Classes): CDUs separate facility water (FWS) from clean treated technology cooling water (TCS), maintain supply temperature above dew point to prevent condensation, and monitor ΔP and leak ropes.
Commissioning Levels 1–5: L1 Factory Witness -> L2 Component/Delivery -> L3 Pre-functional/Installation -> L4 Functional Performance -> L5 Integrated Systems Testing (IST) under full simulated failure.
Frequently Asked Questions
What is the prerequisite for EPI CDCS?
Candidates must hold a valid CDCP certification before sitting for the CDCS specialist exam.
Exact question counts, passing scores, and allowed reference materials vary by testing window and state/agency. Always confirm current rules with the official testing provider.
Sample questions
During an approved maintenance window executing a MOP on a chilled-water valve, a technician encounters an unexpected pressure reading that does not match the MOP's expected state. What is the mandatory action?
Improvise an alternate valve sequence so the maintenance finishes before the window expires.
Pause work, keep a safe state, and escalate to the change lead before proceeding.
Skip the verification line in the MOP and sign off the remaining steps as completed.
Reset the Building Management System server to clear the unexpected pressure reading.
Show the answer
B. Pause work, keep a safe state, and escalate to the change lead before proceeding.
In critical facilities, deviating ad hoc from an approved MOP is a leading root cause of major outages. Whenever actual conditions diverge from the MOP's expected state, technicians must execute a 'Stop Work / Pause', maintain safe state, and consult the change lead or invoke the documented backout plan.
A colocation facility has N+1 redundant UPS modules and chillers, but only a single active chilled-water distribution loop and a single electrical switchgear path serving the computer room. Taking the main switchgear offline for preventive maintenance requires shutting down IT racks. What is the highest Uptime Institute Tier level this design satisfies?
Tier II, because it provides redundant capacity components without concurrent maintainability of distribution paths.
Tier III, because N+1 UPS modules and N+1 chillers are sufficient to achieve concurrent maintainability.
Tier IV, because an N+1 capacity layout automatically isolates any planned electrical switching event.
Tier I, because having N+1 redundant capacity components is ignored unless dual utility substations exist.
Show the answer
A. Tier II, because it provides redundant capacity components without concurrent maintainability of distribution paths.
Uptime Institute Tier II adds redundant capacity components (such as N+1 UPS units and chillers) to a single non-redundant distribution path, meaning planned maintenance on the distribution path still forces an IT shutdown. Tier III requires concurrent maintainability across every component and distribution path, while Tier IV adds automated fault tolerance.
Reference: ANSI/TIA-942-C & Uptime Institute Tier Standard: Topology (Tier II vs. Tier III)
A data center experiences a Severity-1 (SEV-1) cooling-loop trip causing cold-aisle intake temperatures to climb rapidly past 32°C. After notifying the Incident Commander and activating the EOP, what is the primary goal of a post-incident Root Cause Analysis (RCA) once service is restored?
Assign personal blame to the on-shift technician and close the ticket within 30 minutes.
Delete BMS alarm logs older than 24 hours to keep monitoring databases compact.
Disable high-temperature alerts so transient spikes do not trigger future SEV-1 pages.
Identify systemic technical and process causes and implement corrective actions to prevent recurrence.
Show the answer
D. Identify systemic technical and process causes and implement corrective actions to prevent recurrence.
A blameless, evidence-driven Root Cause Analysis (RCA) reconstructs the exact timeline from BMS/EPMS/SEL telemetry, identifies underlying design, procedural, or maintenance root causes, and tracks permanent corrective and preventive actions (CAPA) so the failure mode cannot recur.