CareerExamPro

EPI Certified Data Centre Professional (CDCP) Exam practice test

23 practice questions for this exam, each with a full explanation and cited rule or blueprint reference.

Start practicing

CDCP, CDCS, DCCA & Cisco CCT Data Center: practice drill

10 realistic exam questions, graded as you go, with the exact rule or statute citation for every answer. Start free, no sign-up.

Timed mock exam

23 questions in 28 minutes, drawn from every topic. No answers shown until the end, then a full score breakdown, your weakest topics and a review of what you missed.

Exam Snapshot & Official Blueprint

Official Exam Fee
$500–$650 (EXIN / EPI proctored exam voucher)
Format & Time Limit
40 MCQs · 60 minutes (closed-book)
Passing Standard
65% (26 of 40 correct)
Typical Prep Incumbents
$1,800–$2,600 (EPI accredited 2-day course + exam)

Official Domain Breakdown

Exam DomainWeight
Data Center Site Selection, Raised Floor, Standards & Tier Topologies25%
Power Infrastructure: UPS, Generators, ATS/STS, Grounding & Distribution28%
Cooling, ASHRAE TC 9.9, Airflow Management & Liquid Cooling Fundamentals25%
Fire Suppression (VESDA / Clean Agent), Physical Security & Cabling22%

High-Yield Formulas, Statutes & Rules Cheat Sheet

Frequently Asked Questions

Is the EPI CDCP exam open-book?

No—CDCP is a closed-book 40-question multiple-choice exam administered via EXIN requiring 65% (26/40) within 60 minutes.

Who should take CDCP vs. CDCS?

CDCP establishes core physical infrastructure competency across power, cooling, fire, and cabling; CDCS builds on CDCP with design calculations, Tier availability math, and liquid-cooling engineering.

Practice tests that prepare you for this exam

Practice by topic

About this exam

Agency / Issuer
EPI / EXIN
Region
Global / Online

Exact question counts, passing scores, and allowed reference materials vary by testing window and state/agency. Always confirm current rules with the official testing provider.

Sample questions

Before servicing an energized 480V motor starter on a CRAH fan unit, a facilities technician performs Lockout/Tagout (LOTO) under OSHA 29 CFR 1910.147. After opening the disconnect and applying a personal lock and tag, what critical verification step MUST occur before touching any conductor?

  1. Notify the building security desk so badge access to the data hall is logged.
  2. Wait exactly five minutes and then test the busbar lightly with the back of a gloved hand.
  3. Verify zero energy with a Live-Dead-Live voltage meter check.
  4. Have a second technician apply a zip-tie over the breaker handle instead of a personal padlock.
Show the answer

C. Verify zero energy with a Live-Dead-Live voltage meter check.

OSHA 29 CFR 1910.147 and NFPA 70E Section 120.5 mandate proving zero energy via the Live-Dead-Live (Test-Before-Touch) test: verify the voltage meter works on a known live source, test the isolated circuit phase-to-phase and phase-to-ground to confirm 0V, and re-verify the meter on the known live source.

Reference: OSHA 29 CFR 1910.147 & NFPA 70E Section 120.5 — Verification of Zero Energy

A colocation facility has N+1 redundant UPS modules and chillers, but only a single active chilled-water distribution loop and a single electrical switchgear path serving the computer room. Taking the main switchgear offline for preventive maintenance requires shutting down IT racks. What is the highest Uptime Institute Tier level this design satisfies?

  1. Tier II, because it provides redundant capacity components without concurrent maintainability of distribution paths.
  2. Tier III, because N+1 UPS modules and N+1 chillers are sufficient to achieve concurrent maintainability.
  3. Tier IV, because an N+1 capacity layout automatically isolates any planned electrical switching event.
  4. Tier I, because having N+1 redundant capacity components is ignored unless dual utility substations exist.
Show the answer

A. Tier II, because it provides redundant capacity components without concurrent maintainability of distribution paths.

Uptime Institute Tier II adds redundant capacity components (such as N+1 UPS units and chillers) to a single non-redundant distribution path, meaning planned maintenance on the distribution path still forces an IT shutdown. Tier III requires concurrent maintainability across every component and distribution path, while Tier IV adds automated fault tolerance.

Reference: ANSI/TIA-942-C & Uptime Institute Tier Standard: Topology (Tier II vs. Tier III)

Under OSHA 29 CFR 1910.147 group lockout rules, three technicians are working simultaneously on the same isolated switchgear feeder. Who is permitted to remove a technician's personal LOTO lock?

  1. Any shift supervisor who has a master key to the electrical room lockbox.
  2. The first technician who finishes their portion of the work so the circuit can be re-energized.
  3. The remote Network Operations Center operator once the maintenance ticket is closed.
  4. Only the employee who applied that lock (barring formal emergency removal).
Show the answer

D. Only the employee who applied that lock (barring formal emergency removal).

OSHA 29 CFR 1910.147(e)(3) establishes 'one person, one lock, one key': each authorized worker applies their own lock to a group hasp or lockbox, and only that worker may remove their lock. Emergency removal when an employee has left the site requires a strict documented verification procedure by the employer.

Reference: OSHA 29 CFR 1910.147(e)(3) & (f)(3) — Group Lockout/Tagout